Installation of equipment and interconnecting piping required for the PIA-3 water injection plant and the expansion of the LCI-3A station in the La Cira Infantas field in the department of Santander.
Construction of the motor control room (CCM) and the shelter for injection pumps, including an overhead crane, at the new PIA-3 water injection plant in the La Cira Infantas field.